Skip to content
telford engineering solutions logo
  • Home
  • About
    • Voluntary Modern Slavery Statement
  • TEAM
  • Media
  • Recycling Plants
  • TW WOOD
  • Case Studies
  • Contact
Read more about the article Magnet and Dewatering System

Magnet and Dewatering System

  • Post author:jwebmin
  • Post published:September 1, 2021
  • Post category:

Our team designed and detailed a magnet and dewatering system for an NSW mine. The benefits of this system includes: 1. Reducing the amount of tramp steel and water in…

Continue ReadingMagnet and Dewatering System
Read more about the article Water Storage Access Stair Tower
default

Water Storage Access Stair Tower

  • Post author:jwebmin
  • Post published:April 21, 2021
  • Post category:

Our team has recently completed the design, detailing, and certification of a new water storage access stair tower. The stair tower will allow safe access to the water tank for…

Continue ReadingWater Storage Access Stair Tower
Read more about the article TES Partnership with Market Leaders in Global Mining Operations

TES Partnership with Market Leaders in Global Mining Operations

  • Post author:jwebmin
  • Post published:January 8, 2020
  • Post category:

TES recently partnered with a global market leader who specialises in making global mining operations more productive and profitable.  The project involved delivering a support structure for a TC66 cone crusher, and…

Continue ReadingTES Partnership with Market Leaders in Global Mining Operations
Read more about the article Glencore’s Integrated Approach To Integra Recommissioning Delivers Maximum Benefit

Glencore’s Integrated Approach To Integra Recommissioning Delivers Maximum Benefit

  • Post author:jwebmin
  • Post published:July 19, 2018
  • Post category:

Glencore Integra Engineering Manager David Young and Operations Manager Peter Ostermann (Operations Manager at Integra) in front of some of the plant involved in the Chute Technology project. A three-pronged…

Continue ReadingGlencore’s Integrated Approach To Integra Recommissioning Delivers Maximum Benefit
Read more about the article Milsons Point Gangway

Milsons Point Gangway

  • Post author:jwebmin
  • Post published:July 19, 2018
  • Post category:

The Design Team at TES has built its reputation for design of large scale projects for public and private infrastructure, including recycling, mining, materials handling, oil, gas and waste water…

Continue ReadingMilsons Point Gangway

Contact Info

Sales | Operations
Gary Telford
Lead Design Engineer | Director
0412 406 939
[email protected]

Careers
Bron Telford
0401 840 101
[email protected]

Facebook Linkedin

Contact Us

Have a question? Please complete this form and we’ll get back to you as soon as possible.

  • This field is for validation purposes and should be left unchanged.
© Copyright 2022 Telford Engineering Solutions. All rights reserved. web design newcastle
  • Home
  • About
    • Voluntary Modern Slavery Statement
  • TEAM
  • Media
  • Recycling Plants
  • TW WOOD
  • Case Studies
  • Contact